ARTICLE 1
GENERAL PROVISIONS
| SECTION 1.1 |
Title |
Page 4 |
| SECTION 1.2 |
Authority and Administrative Agency |
Page 4 |
| SECTION 1.3 |
Area of Jurisdiction |
Page 4 |
| SECTION 1.4 |
Purpose |
Page 4 |
| SECTION 1.5 |
Exceptions |
Page 5 |
| SECTION 1.6 |
Amendments |
Page 5 |
| SECTION 1.7 |
Separability and Previous Regulations |
Page 5 |
| SECTION 1.8 |
Effective Date |
Page 5 |
| SECTION 1.9 |
Relationship to Zoning Ordinance and Other Ordinances |
Page 6 |
| SECTION 1.10 |
Land Sold in Violation of Subdivision Regulations |
Page 6 |
| SECTION 1.11 |
Penalties |
Page 6 |
ARTICLE 2
CLASSIFICATION OF SUBDIVISIONS
| SECTION 2.1 |
Classification |
Page 7 |
| SECTION 2.2 |
Subdivisions |
Page 7 |
| SECTION 2.3 |
Non-conforming Lots of Record |
Page 7 |
| SECTION 2.4 |
Farm Plats |
Page 8 |
ARTICLE 3
PROCEDURES AND REQUIREMENTS
| SECTION 3.1 |
Subdivisions |
Page 9 |
| SECTION 3.2 |
Non-conforming Lots of Record |
Page 17 |
| SECTION 3.3 |
Farm Plats |
Page 19 |
ARTICLE 4
CONTENT REQUIREMENTS FOR SUBDIVISION PLATS AND PLANS
| SECTION 4.1 |
Purpose |
Page 22 |
| SECTION 4.2 |
Sketch Plan Requirements |
Page 22 |
| SECTION 4.3 |
Topographic Survey |
Page 22 |
| SECTION 4.4 |
Preliminary Lot Layout Requirements |
Page 23 |
| SECTION 4.5 |
Drainage Plan Requirements |
Page 25 |
| SECTION 4.6 |
Traffic Impact Study |
Page 27 |
| SECTION 4.7 |
Construction Plans |
Page 31 |
| SECTION 4.8 |
Final Plat |
Page 34 |
| SECTION 4.9 |
Horizontal Property |
Page 39 |
| SECTION 4.10 |
Zero Lot Line |
Page 40 |
ARTICLE 5
DESIGN AND IMPROVEMENT STANDARDS
| SECTION 5.1 |
Purpose |
Page 44 |
| SECTION 5.2 |
Subdivision Design Principles |
Page 44 |
| SECTION 5.3 |
Adequate Public Facility Standards |
Page 46 |
| SECTION 5.4 |
Public Need Standards and Requirements |
Page 46 |
| SECTION 5.5 |
Lot and Block Standards |
Page 48 |
| SECTION 5.6 |
Drainage Standards |
Page 49 |
| SECTION 5.7 |
Street Standards |
Page 52 |
| SECTION 5.8 |
Standards for Traffic Impact Study |
Page 64 |
| SECTION 5.9 |
Standards for Construction Fill Materials for Streets |
Page 65 |
| SECTION 5.10 |
Surveying and Monumentation Standards |
Page 66 |
ARTICLE 6
CONSTRUCTION AND INSPECTION PROCEDURES
| SECTION 6.1 |
Purpose |
Page 67 |
| SECTION 6.2 |
Procedures |
Page 67 |
ARTICLE 7
DEFINITIONS
| SECTION 7.1 |
Use of Terms7 |
Page 72 |
| SECTION 7.2 |
Defined Terms |
Page 72 |
Appendix A: Street Standards
Appendix B: Storm Water Management Requirements
Appendix C: County Street Lighting
Appendix D: County Fire Protection Ordinance
Appendix E: Building Permit, Plot Plan, and Graving/Paving Permit Site Plan Requirements
Appendix F: Pavement Thickness Standards and Tables